Developing a system is not that difficult for developers these days, the key is to include phases to increase the success rate of development. So what phases should Guangzhou system development include? The following name Rui dynamic for you to introduce these several stages can not be biased.
1.Demand stage. Before developing a system for any industry, we must first enter a phase, which is the requirements phase. At this stage, it is necessary to analyze the development requirements proposed by the customer, determine the objectives and functions of the development requirements, and enter the next stage after reaching an agreement with the customer.
2. Design phase. After completing the requirements phase, the next phase is the design phase. This stage mainly involves the overall design of the development process of the project, and then the establishment of an established implementation plan. Of course, after we establish the implementation plan, we also want to let the customer understand their own development ideas, so as to determine the specific development plan.
3. Research and development stage. After we have designed a specific solution, we can enter the research and development phase. In this stage, in order to ensure the success of R&D within the specified period, we need to formulate a detailed development process and strictly follow the development process, so as to successfully complete the R&D of the project.
4. Test phase. If the development of the project is confirmed to be successful, then we also need to test the system developed by ourselves in the test phase, so that we can check whether there are bugs and any unexpected problems in the system developed by ourselves. For the occurrence of bugs and problems should be timely modified processing, for the system behind the online adequate preparation.
5. Online phase. We can say that all the previous stages are to lay the groundwork for the live phase, and if we are sure that the software is running without any problems during development, then we can try to go live. Of course, when the software is online, we should pay attention to the software at any time, so as to greatly improve the security and stability of the software.
When we develop the system in Guangzhou, we need to include some stages, mainly including the demand stage, the design stage, the research and development stage, the test stage, the on-line stage and so on. Only by including these stages can we make our development ahead of a rainy day.